• Please use tab to navigate through video controls.
  • Upon entering the player press space bar to reach the play button

3D Flythrough Animation

This is a 3D flythrough animation of the proposed design created by King and Campbell. The animation starts west of the railway line at the Orlando Street Harbour Drive intersection...Read more


3D Flythrough Animation
3D Flythrough Animation
This is a 3D flythrough animation of the proposed design created by King and Campbell. The animation starts west of the railway line at the Orlando Street Harbour Drive intersection looking up Harbour Drive towards the City Centre. The animation finishes at the intersection of Hood Street and Campberdown Street, looking back towards the Jetty Foreshores. Please note: at the end of the video (Hood Street Camperdown Street intersection looking back towards the Jetty Foreshores) the built form on the left hand side of the street is an indicative representation ONLY of the current controls within the Coffs Harbour Development Control Plan 2015.
Video Presentation of DRAFT Coffs Jetty Strip Streetscape Plan
Video Presentation of DRAFT Coffs Jetty Strip Streetscape Plan
Video presentation by lead consultant David Tooby from King and Campbell, running through the design charrette process undertaken for this project . This presentation will describe analysis and studies undertaken, along with stakeholder input that influence the process and the design outcomes of the project.